Sample of Results by Industry
BSMS's consulting practices produce measurable and sustainable results that add value to our clients bottom line profits. Typical results are presented in the table below.
|
Activity |
Man Hours |
Safety Performance Pre-Start (per 200,000 hrs) |
Safety Performance Post-Intervention (per 200,000 hrs) |
Percentage Improvement |
$ Value Added (approx) |
|
LNG Operator |
10,543,250 |
TRIR = 0.51 LTIR = 0.21 |
TRIR = 0.25 LTIR = 0.07 |
TRIR = 51% LTIR = 66% |
$17,132,781 |
|
LNG Construction |
8,622,000 |
TRIR= 0.34 |
TRIR =0.06 |
TRIR = 82% |
$14,010,750 |
|
LNG Construction |
19,410,000 |
TRCR = 0.66 LTIR = 0.13 |
TRCR = 0.15 LTIR = 0.03 |
TRCR = 77% LTIR = 77% |
$25,500,000 |
|
Hydrocarbon Processing |
400,000 |
TRIR= 3.0 |
TRIR = 0.0 |
TRIR = 100% |
$4,000,000 from injury reductions $500,000 p.a. from 5te/Hr of steam savings
32% Annual Insurance Premium Reductions |
|
Titanium Dioxide Producer |
5,000,000 |
LWIR = 2.7 |
LWIR = 0.0 |
LWIR = 100% |
$11,000,000 |
|
Nickel Refining |
1,275,000 |
DIF = 3.5 |
DIF = 0.5 |
DIF = 86% |
$3,500,000 |
|
Paper Production |
3,500,000 |
TRIR = 0.60 |
TRIR = 0.12 |
TRIR = 80% |
$4.565,000 |
|
Manufacturing |
4,320,000 | TRIR = 5.68 |
TRIR = 1.2 |
TRIR = 79% |
$7,020,000 |
|
Paint Manufacture |
826,666 |
TRIR = 2.0 |
TRIR = 0.5 |
TRIR = 75% |
$1,408,333 |
|
Foods |
1,680,000 |
TRIR =9.8 LTIR= 1.00 |
TRIR= 4.2 LTIR = 0.0 |
TRIR= 57% LTIR = 100% |
$2,730,000 |
|
Agrichemicals |
800,000 |
TRIR=2.3 |
TRIR =0.75 |
TRIR=66% |
$1,300,000 |
Disabling Injury Frequency = DIF; Total Recordable Injury Rate = TRIR; Total Recordable Case Rate = TRCR; Lost Workday Injury Rate =LWIR
Back Read More »
